Examples of Flanagan's project management

Woodbridge Energy Center (2018)

Chalmers & Kubeck was contracted by Velan to install new vent valves on their generating units. This was to correct sizing issues that were identified in operation. The work required coordination of efforts between operations, the contractor, Auma actuators, and Velan.

Williams Pipeline Transco (2019)

Williams Transco was looking to modernize two LNG tanks located at their Carlstadt, NJ location. The manual valves had been in service since the '70's and represented both operational and safety concerns. Chalmers & Kubeck worked with Black & Veatch to provide an engineered solution that could be performed under minimal loss of operation. The valves were obsolete with integral CDO (Chain Drive Operators). We mechanically removed the existing CDOs, replacing them with Limitorque L270 gas powered actautors. Diagrammed was our design/approval process between Black & Veatch and C&K.